Laserfiche WebLink
rw~ul <br />PLATTE SAND & GRAVEL, LLC <br />P.O. BOX 712 <br />LITTLETON, CO 80160 <br />(303)238-1130 <br />August 8, 2006 <br />RECEIVED <br />Mr. Carl Mount <br />Division of Minerals and Geology ,i pig 11 2006 <br />Minerals Section <br />1313 Sherman Street Suite 215 r/DNisionofRedamauos• <br />Denver, Colorado 80203-2273 MirnngandSafeH <br />Dear Mr. Mount: <br />Re Platte Sand & Gravel, LLC - S&H Mine, <br />Annual Report- Permit No. M-2000-158 <br />Our files indicate that the anniversary date for this <br />permit is August 10. This pit HAS NOT been granted a Temporary <br />Cessation and it HAS operated more than 180 days this year. The <br />Financial Warranty for this operation is $1,123,000.00, the <br />permitted area is 1,239.40 ac. and the pit is divided into 9 <br />Reclamation Phases. An amendment was approved on August 25, 2004 <br />allowing development of Longhorn Lake and a portion of Sharkeys <br />Lake as developed water storage. <br />Please refer to the annual report map attached for the <br />location of the areas discussed in this permit. We have chosen <br />to use an excerpt from the Mining Plan Map showing just the <br />disturbed area. We will deal specifically with each of the <br />Annual Report requirements outlined in Rule 1.15 of the Rules and <br />Regulations and the annual notice letter. <br />(1) Mining was temporarily suspended on the terrace deposit <br />covering 11.00 acres f in the Highlands Lake area (dark <br />green). Mining continued on the 23.81 acres $ section of <br />Sharkey Lake west of the existing Plan Site and on 14.14 <br />acres t in the reservoir area (brown hatch). The Plant site <br />and material storage area covers 25.00 acres t (orange <br />hatch}, We have approximately 85,000 yd3 of topsoil and <br />waste rock stored south of the excavated area (hatched tan). <br />The topsoil will be saved and used for reclamation. The <br />ponds cover approximately 14.0 ac ± (blue). Slurry wall <br />construction on the Sharkeys Lake area began after the bond <br />was posted and the amendment permit issued. The liner is <br />complete along the southern 1/3 and remaining 2/3 will be <br />completed this year. <br />(2) Grading, shaping and resoiling was completed in the High- <br />lands Lake area this spring as approved in the permit. <br />Seeding will take place this fall on the areas that will not <br />wL~ <br /> <br />