My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33611
DRMS
>
Back File Migration
>
Report
>
REP33611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:10:03 AM
Creation date
11/27/2007 6:34:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Report
Doc Date
4/3/1995
Doc Name
REVIEW OF MCCLANE & MUNGER ARH C-80-004 C-81-020
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III Illllllllllllllll <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />131 3 Shaman St., Room 215 <br />Denver, Colorado R0203 <br />f'honc 1303) R66-3567 <br />{ A%~. 13031 B32-8106 <br />To: Dan Mathews <br />pI~ <br />From: Barbara Pavlik ~~ <br />Date: April 3, 1995 <br />Re: Review of McClane aF Munger AIiR (C-BO-004 C-81-020) <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Ray Romer <br />Governor <br />lames 5. Lochhead <br />Executive Director <br />Michael B. Long <br />Dinsion Director <br />I have reviewed the 1994 AHR for the McClane and Munger Mines and <br />have the following comments: <br />1) Apparently, the monitoring plan that is in the Findings <br />Document is the appropriate monitoring plan for the mine <br />during its temporary cessation status. It would be a <br />good idea to have this incorporated into the permit <br />application package during the next midterm. <br />2) The operator's proposed substitution of groundwater <br />monitoring in GW-3 for the current monitoring in GW-4 is <br />appropriate, given that monitoring in GW-4 is being <br />affected by nearby irrigation. The proposed change in <br />the groundwater monitoring plan should be submitted in <br />the form of a technical revision to the permit. <br />3) The operator should submit, in future AHR's, a map which <br />shows the locations of the hydrologic monitoring <br />stations. These could be superimposed on the existing <br />maps submitted with the AHR which show the location of <br />the underground mine workings. <br />If you or the operator have any questions, please call. <br />BLP <br />cc: LPR <br />
The URL can be used to link to this page
Your browser does not support the video tag.