Laserfiche WebLink
<br />Larry Oehler <br />March 21, 1994 <br />Page 5 <br />Site Monitoring and Reporting <br />~~ <br />Quarterly water sampling took place in January, April, July, <br />and October. Analysis reports were submitted to DMG upon <br />receipt from the analytical lab. <br />Bi-weekly water sampling frequency continues. Analysis <br />reports have been submitted to DMG upon receipt from the <br />analytical lab. Evaluation of the analytical results <br />indicate that water quality has not been influenced by the <br />mining operation. <br />Results from the humidity cell testing on the quarterly <br />tailings composite samples have been submitted to DMC upon <br />receipt from the lab. Testing on second, third, and fourth <br />quarter 1992 samples is on-going. <br />As specified in the approved TR-010, weekly and monthly pond <br />compliance reports have been submitted to DMG. Also, INCO <br />monitoring reports have been submitted monthly. <br />Enclosed is the $550 annual fee payment and a property map <br />showing disturbance and reclamation activities. <br />If you have any questions, please call. <br />Sincerely, <br /> <br />Alana L. Scott <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />