Laserfiche WebLink
<br />~• <br />138 ~ R. T. CHEW, III • <br />Creek Alcmbcr, with the upper 10-20 (l n( the urculLcr <br />16nlst smlthrast w'anI over the Inwrr part. •I•hr Rile}' <br />Gulch slruclurc In•nds al rigLl angles ;u:ross ILc crest <br />of ILr f_ry<lal Cna•k mdicli nc. \Villi;uu IS. Cashion u( <br />the U.S. Crnlugicul Surt'c}' (oral cnumtmt„ 197;1) can <br />siders Ihal Ilse thrusting ocrun ed during deposition n( <br />the overt}ing Ihirk rhanncl sandstanr. of the Uinta For- <br />maliun, which conlpresscd the underlying gelatinous marl <br />61O11C. <br />111'Ultl)Lf)Gl' <br />•Ille 0X1' l:unl lies un the IopnF raphic edge of the <br />Picranrc basin, and cxlr;n=ice aquifers similar to Ihosc <br />in ihr. center of the 6as'm du nut urcur uu ILr, land. <br />Two aquifers, huwcrrr. have hero idrntiGrd ou the 0X1' <br />land. l-6e upper aqui(r.r urcurs al the base ul alluvium <br />in stream valleys ou Ihr Uinta Furnlatinn :uul Parnchulc <br />Crock AL•u+hcr of 1Lc Green trivet Fnrntalinn, l~6rougll- <br />nut Ihr 0\Y laud Ihr rr:chargc arras (nr Ihcsc. local <br />allucinl aquifers grorrall)' an: 1011 nc or Icss. Cunsr- <br />rlumtll}', nll6uugh springs al Ihr ha=r n( the alluviwn <br />flow ne much as t0 nwnths u( Ihr sear, the (low aL nn <br />time uu:aslmrs uum• Ihau 11.25 gal/min, •I~he Uintn Fur <br />motion undrrlg ing llu• ullnvium is lr:u+smissivc in onus <br />arras, and ground water in Ihr alluvium sort the upper <br />earl n( the Led rnrk is pndra6ly inlcramneclcd. 'Chic <br />alluvial agni(rr is an ingrn rlanl sourer of wader (nr lives <br />clock on 16r, I'a rar6ldn Crcrk-Roan Creek divide. <br />I{rgionally, the upper 100 fl ..f the Parachute Crcrk <br />Alrnd~rr is highly (rrrturrd. 'Chis rmr he seen on the <br />nu(crop where, aLundanl brown irnnslaining nrcurs <br />downward Iron a6nul 2110 (( ;t6oec the Alnhogant' Irdgr. <br />'I'll is (rarllnr ;t tees rmrvlil ulrs au a~pli(rr 16at in sonm <br />areas contains rousidrlablr, annuuus of water. Water <br />levels measured rmtcurrrnlly tvit6 drilling in 6nles arms <br />the 0X'1' pmprrl s, huw'rerr, indicate rather pant intrr- <br />ruuurrlion bcncrrn the fraclurrs Lrcausr. the levels van <br />Icy as nlhch as 5(1 ft. This fracture zone is far enough <br />above the arc-hearing interval Ihat it has Im cQcct on <br />mining. <br />Iwdah•d (raclun•s occur in Ihr Alalmgany Irdgc, hul <br />(etc Lace yielded w;nrr in the mining operations. Tu4 <br />beds Thal orrur throughout Ihr I'a rm'Im le Creek Alrmhrr <br />arc Ira nsm issivr ;uuf tcrrp sncdl :un,+uuls of wain into <br />the ~minr• mm kiu;;~. luuurdialrly' following heavy nin <br />slnrnls :old during the spring Ihaw. water cnh•rs tlu• <br />ruler 200 (I nl Ille mine, dri(I Illr~ugh (raclurrs, indicating <br />Ihal, ahhmtgh (rachvrs in Ihr AlaLugmty Icdgr. arr open <br />In Ihr riin, lhr.y arc nnl recharged nl any Feral distance <br />(runt il. <br />I{rgioual dip nn Ihr 0\}' properly is north al alrnul <br />I ". hips ..R der. west (I;u~k u( Crest, 1 Cn•rk anticline arr. <br />shout 1°-2° no116n'csl. The cumLiuation u( clips away <br />from llw, ring and n(( the flanks of the anticline leave <br />esscullally nn rtrLalge area fur any potential aquifers <br />un llrc (}X1' property. Cnu~cgncutly, uo nmjnr ground- <br />w.ucr prulrlrlils have been rncouulered during the research <br />project. <br />F.\'1'ItAI"I'It)N UI'Ii1G~'1•IONS <br />Alining.-"The Occidental nil shale process cmisists of <br />Uvu major phases, mining and relorling. The major <br />purpose of the mining phase is In develop 15-20 <br />percent raid space. distributed as evenly as possible <br />lhnmgh the slratigra phir, section In Lc rctortrd. "This is <br />nccungdisLcd by mining n cnhnuc u( ruck equivalent to <br />the eoid spm~e desired. Alining is dune iu ILe leaner <br />6uriznns ..( the drprtil. Ilnles arc drilled up nod down <br />into lhr area to he Iraclurnl mul arr. loaded wish ammonium <br />nit tale.-furl nil Ihal is detonated hl (ragntrul Ibc rock into <br />the mined eoid. Under production conditions, mining <br />will Le dune iu panels aLuul 3,300 (I on aside, as shown <br />ml Pigw~c 4. Whcrc. the sera w hr mined can Lc reached <br />Gam ml outcrop, dri(Is will Lc drivl•n in al 2 ur 3 hnri- <br />zuns. \['hen• Illy area mull 6r n:rdw.<l 6)' a sha(1, 2 <br />sha (IS will Lc used, an air slm(t 2~1 (t in dianlclcr and <br />a prndurli,m sh;l (I 211 h in diameter. In either inslanrc, <br />all (acilil its, power pl;mis. s6~gls. n0iccs, and su forth <br />ran he nndrrF round lu rcdurc cnvirountenlal impact on <br />Ihr, surfarr. •I~hc only sinuaulrs needed m+ the: surface <br />would Lc a pu rk6lg Inl, an anuunnium nitrate-fllcl nil <br />plant, and Ihr hen brad (rn mr=, if slw(IS arc used. The <br />present entrance to the, research minx. is shnyvn on Figure 5. <br />Rrprriin~. - The shape of Icpieal prod ucliun retorts is <br />shown nu Figun• (+. In n•I+IrtinF. ihr lop of dtc ruLLle <br />area crealrJ Ly Llasling is lu•:ded until cumbuslhm cont- <br />ulenr;rs. (.a< is cin;uLucd ~Ihn+ugh the retort from lop <br />In hnllolll. /\bnlll ,{0 pCl'r:Plil u( IIIC Fay IS rrc}'clcd hack <br />In the lop n( Ihl•. retort and about 7(1 pe.rcenl is vented, <br />to Lr. replaced tcilh an rgnivalcnl volwne of air to pro- <br />vide n.xsFrn. Ahrr burning cnunueuces, a relorling (root <br />is rsml~li~hrd ahead of Ihr flanlr Irnnl. herogcn in the <br />marlstunc is Ihcrnurcrm'krrl al approximately 900°F, and <br />the nil Onws dawn Ihruugh Ihr n16Llr. In the Lnllom of <br />the n•lurl n'hrre it is rollrrled in a sump. Excess carbon <br />remaining (root the ILrrnnrracking is cnnsu metl as fuel. <br />Some Fas, inrludiuF ra rLon munn,lide, hvd rogrn, methane, <br />t•16anr, and other IiF61 hvd ~ornrhons, is produrrd (ram <br />Ihr shale during rrlnrtiuF. 'Che gas lakrn nut of the <br />n•InrlinF ryrlr rnulains r~~adially nn oxygen. II is a low- <br />Rlu furl Ibal is rxprlard in Le burned in turbines to <br />prnsidr power (nr ILr entire operation. Excess power <br />produced ran br, returned In Ihr Colorado distribution <br />grid. Pn•sures used arr essentially alnusphcrir. at the <br />bottom n( the rclnrt. t.as vrlnr.ily Ihrongh the retort is <br />also ven~ Inw. Irss Ihan 1 II/sec. llle surface installation <br />at the pilot plant is shown nn Figure. 7. <br /> <br />i' <br />