Laserfiche WebLink
. : A~`1NUAL REP1~2T FOI2• ~II IIIII~III~III ~II ~I~L <br />~'a<esday;~ctobe>r°09, 2001 <br />,~ <br />~~ ,.. • <br />~~~o~~ F/ ~I~ii <br />OCT 9 2 ~ ~Gt <br />r 1 <br />M-1990-114 <br />The tdoland Gulch Pit is used for a source of pit run material that is used as road <br />surfacing. Material is presently being mined with a dozer into a stockpile on the <br />southwest side of the pit, Approximately 30,000 c.y. of material was removed during this <br />~••~~ last•year: dtds expected•that approximately.the same amount will be removed this year. <br />.•. ~ No•obher reclamadion took:place this year and.nons will probably not occur next yeaz. <br />Excavatiori will continue iu the same area. This pit is on BLM property and we are <br />- following the BLM's requirements for maintenance. <br />®luislon of Minerals and Geology <br /> <br />