Laserfiche WebLink
Bowie Resources Limited <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />2nd Quarter - 1995 <br />Item Y N Comments <br />1. Quantity of waste material added to Approximately 141 tons of gob was added to the <br />waste disposal area this quarter? Y waste disposal pile this quarter. ~ <br />2. Waste material deposited and Waste material was not compacted during this quarter. <br />compacted in 24' lifts? NA <br />3. Drainage aReraSons constructed? No drainage aRerations were constructed during the <br /> NA quarter. The existing drainage pattern was maintained <br /> around the perimeter of the pile to protect outslopes <br /> and direct drainage at the tce of the pile. <br />4. Present height of waste material? Highest height approximately 99.0 feet. <br />5. New bench contracted? <br /> N <br />6. Refuse material outslopes placed at Waste material not laid in lifts, so no new <br />1 V:2H outslopes? Y outslopes were buiR. <br />7. Adequate dranage on top of completed Drainage on top of completed pile has been <br />fill? Y maintained. <br />8. Bench drainage adequate? Bench drainage was maintained throughout the quarter. <br /> Y See Item 3. <br />9. Outsbpes covered with 4' non-toxic, No new outslopes have been built this quarter. <br />non-combustible material? NA <br />10. Berms constructed on outsbpes? <br /> Y <br />11. Evidence of structural defects? <br /> N <br />12. Topsoil adequately salvaged and No additional topsoil was salvaged from this pie <br />stored? NA this quarter. <br />13. Trash removed? Trash is removed as material is laid in lifts. No <br /> Y new lifts were placed this quarter. <br />14. Additional comments? <br /> N <br />I certify the above report as being accurate to the best of my knowledge. <br />Signature <br />i <br />s~y -95 <br />Date <br />