My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33400
DRMS
>
Back File Migration
>
Report
>
REP33400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:09:48 AM
Creation date
11/27/2007 6:30:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
8/14/1995
Doc Name
PN C-81-038 2ND QTR 1995 REPORTS
From
BOWIE RESOURCES LTD
To
DMG
Annual Report Year
1995
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources Limited <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />2nd Quarter - 1995 <br />Item Y N Comments <br />1. Quantity of waste material added to Approximately 141 tons of gob was added to the <br />waste disposal area this quarter? Y waste disposal pile this quarter. ~ <br />2. Waste material deposited and Waste material was not compacted during this quarter. <br />compacted in 24' lifts? NA <br />3. Drainage aReraSons constructed? No drainage aRerations were constructed during the <br /> NA quarter. The existing drainage pattern was maintained <br /> around the perimeter of the pile to protect outslopes <br /> and direct drainage at the tce of the pile. <br />4. Present height of waste material? Highest height approximately 99.0 feet. <br />5. New bench contracted? <br /> N <br />6. Refuse material outslopes placed at Waste material not laid in lifts, so no new <br />1 V:2H outslopes? Y outslopes were buiR. <br />7. Adequate dranage on top of completed Drainage on top of completed pile has been <br />fill? Y maintained. <br />8. Bench drainage adequate? Bench drainage was maintained throughout the quarter. <br /> Y See Item 3. <br />9. Outsbpes covered with 4' non-toxic, No new outslopes have been built this quarter. <br />non-combustible material? NA <br />10. Berms constructed on outsbpes? <br /> Y <br />11. Evidence of structural defects? <br /> N <br />12. Topsoil adequately salvaged and No additional topsoil was salvaged from this pie <br />stored? NA this quarter. <br />13. Trash removed? Trash is removed as material is laid in lifts. No <br /> Y new lifts were placed this quarter. <br />14. Additional comments? <br /> N <br />I certify the above report as being accurate to the best of my knowledge. <br />Signature <br />i <br />s~y -95 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.