' ~ ANNUAL REPORT •
<br />:.; : .; . INSTRUCTIONS
<br />According to C.R.S. 34-3?-I Iti(3), and C.R.S. 34-32.5-I 16(3)(x), on the annivzrsary date of the permit each year,
<br />the operator shall submit a report and a map showing the extent of current disturbances to affected land.
<br />reclamation accomplished [o date and durin¢ the preceding year, new disturbances that are anticipated to occur
<br />during the upcoming year. and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and map to enclosed annual report form. (An adequately labzled map that Clearly delineates and includes
<br />the above elements may suffice fur a written report.)
<br />If your operation is subject to [he provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report the following information as required by ?CCR 407-I, 407-4, and Rules
<br />1.13.7(1)(a):
<br />(i) the condition of the operation at the time of cessation;
<br />(ii) what specific measures Have been and will bz implemented to comply with reclamation, performance
<br />standards and Environmental Frotection Plan requirements, if they are par[ of your approved application; and
<br />(iii) plans for• resumption of training operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(i) Per [he requirements of 2 CCR 407-1, 407-4, and Rules 1.15(l)(a), provide an updated
<br />stateirfent regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b}, permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstar ces which may affect the adequacy of the Deed of Trust, or Security ae Bement,
<br />and the value of the property subject to either of these instruments. The report shall also provide
<br />- - - -- -' -'proof that there are no past=due property razes. - - - ~ - - - ~ --
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (10%) of the bank's capita] surplus accounts.
<br />(ii) Per the requirements of 2 CCR 407-1, 407.4, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien oit any fixtures and Equipment, the operator shall provide a report in suFficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures and equipmzn[.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules L15(l)(c), all monitoring information
<br />required as part of [he approved permit application, to include [he Environmental Protection Plan. (Pleasz
<br />note that if you are not a Desi;nated Mining Operation, you will not have an Environmental Protection
<br />Plan as part of your approved permit.)
<br />
|