Laserfiche WebLink
• <br />• <br />Ii <br />EXECUTIVE SUMMARY <br />1.0 INTRODUCTION <br />1.1 Terms and Conditions <br />1.2 Purpose and Scope of Work <br />1.3 Project Description <br />2.0 LAND DISTURBED IN 2006 <br />3.0 RECLAMATION ACTIVITIES IN 2006 <br />3.1 Constructed Wetlands Area and Adjacent Slope <br />3.2 Tie Camp Creek Disposal Cell <br />4.0 MONITORING AND ANNUAL REPORTING <br />4.1 Slope Movement Vector Analysis <br />4.2 Inclinometer Evaluation <br />4.3 Pinnacle Mine Workings Monitoring <br /> 4.3.1 Spring and Seep Monitodng <br /> 4.3.2 Groundwater Levels <br /> 4.3.3 Pinnacle Adit Flow <br /> 4.3.4 Radium and Uranium Concentrations at PP-01 <br />4.4 Sediment Control Embankment <br />4.5 Waste Rock Dumps <br />4.6 Water Quality Monitoring <br />4.7 Radioactive Materials License <br />5.0 INSPECTIONS <br />6.0 SURETY <br />7.0 RECLAMATION ACTIVITIES PLANNED FOR 2007 <br />1 <br />3 <br />3 <br />3 <br />3 <br />4 <br />4 <br />6 <br />6 <br />10 <br />10 <br />12 <br />12 <br />13 <br />13 <br />14 <br />14 <br />18 <br />18 <br />19 <br />19 <br />20 <br />20 <br />20 <br />Table of Contents <br />