Laserfiche WebLink
i 1 <br /> S AN L U S S M= N E <br />' CONTRACT OR :CONETEC CPT DATE 04: 27:95 11 :54 <br /> LOCATION SAN LUIS CONE 10 TON A 0 27 <br /> HOLE <br />Tot. Uni CPT <br />t Wt. (a 1B1 <br />vg) <br />95 pcf Water tabl e (meters) 25 <br /> DBP t6 ac (avg( Fa (avg( Rf (avgl SICY' SOIL BBBAYIOUR tfP6 Bq - Dr PBI SPi Su <br />' (aetersl (feet( (tsf( (taf( (g( (tall (3( deg, N tsf <br /> 0,25 0,82 1.51 0,30 4.05 0,02 clay UNDRND UNDFD T .59 <br /> 0.50 1.64 6.21 0.21 4.38 0.06 clay ONDP,ND UNDRD 6 .49 <br />' 0.15 2.16 8,43 0.36 4,27 O.10 clay UNDP,ND UNDFD 8 .66 <br /> 1.00 3.28 10,10 0,24 2.24 0.14 clayey sil t to silty clap UNDFND UNDFD S .84 <br /> l.tf 4.10 10,09 0,21 2.04 O.18 clayey sil t to silty clay UNDP8ID UNDRD S .T9 <br /> 1.50 4.92 9.88 0.20 2.04 0.21 clayey sil t to silty clay UNDFND UNDFD S .77 <br /> 1.15 5.74 13,59 0.06 0.41 O.ZS aandp alit to clayey silt UNDFND UNDFD S 1.06 <br /> 2,00 B.S6 21. T9 O.I6 0.12 0.29 silty sand tc candy silt 40-SD 36.38 1 ONDBFINBD <br /> 2.25 7.38 21.11 0,15 0.69 0.33 silty sand to sandy silt <40 34-36 7 UNDBFINBD <br /> 2.50 8.20 22,98 0.11 O,i2 0.31 silty sand to sandy silt <4D 34-36 T UNDBFINBD <br /> 2, TS 9.02 70.93 0.14 0,46 0.41 silty sand to aandp silt 40-SO 36-18 l0 UNDBFINBD <br /> 3.00 9.84 48.81 O,12 0.25 0.45 sand to silty sand SO-60 38-40 12 UNDBFINBD <br />' 3,25 10.66 45.42 0.15 0.34 0.49 sand to silty saod SO-6D 36-38 ll UNDBFINBD <br /> 3.50 11.48 40.54 O.14 0,36 O.S3 sand to silty sand 40-SO 36-18 IO UNDBFINBD <br /> 3. TS 12.30 40.21 0.11 0.28 O,S6 sand to silty sand 40-SD 36-38 10 UNDBFINBD <br /> 4.00 13.12 44,94 0,15 0.33 0.60 saod to silty sand SO-60 36-38 I1 UNDBFINBD <br /> 4.25 13.94 42.81 0.14 0.32 0.64 sand to silty sand 40-SO 14-36 ]0 UNDBFINBD <br /> 4.50 14.76 43,33 0.11 0.25 0.68 sand to silty sand 40-51 34-36 10 UNDBFINBD <br /> 4.75 15.58 53,38 O.10 0.19 0.72 sand to silty saod 50-61 16-18 13 UNDBFINBD <br />' 5.00 16.40 47.10 0.05 0.11 0.76 sand to silty snnd 40-51 14-J6 11 UNDBFINBD <br /> 5.25 17.22 42.55 0.09 0.21 0.80 snnd to silty sand 40-51 J4-36 10 UNDBFINBD <br /> 5.50 18.D4 41.12 0.05 0.12 0.84 saod to silty sand 40-SO J2-34 10 UNDBFINBD <br /> 5.75 , ' 18.86 42.59 O,OS 0.13 0.88 sand to silty sand 40-SO 32-34 10 UNDBRLYBD <br /> 6.00 19.69 42.51 0.20 0.46 0.92 sand to silty nand 40-50 32-34 IO UNDBFINBD <br /> 6.25 20.51 40.68 0.13 0.31 0.95 sand to silty sand 40-50 32-34 10 UNDBFINBD <br /> 6.50 21.33 39.23 0.10 0.24 0.99 sand to silty sand t40 32-34 9 UNDBFINBD <br /> 6,75 22.15 J9.80 0,09 0.t3 1,03 Band to silty sand t40 10-32 10 UNDBFINBD <br /> 1,00 22,91 38.25 0.10 0.21 I.OT sand to silty snnd t40 30-32 9 UND8RIN6D <br /> 7.25 27.19 39,51 0,09 0.21 1.11 snnd to silty sand <40 30-32 9 UNDBFINBD <br />' 1.50 24.61 39.82 0,13 0,32 1.IS sand to silty sand <40 30-72 (0 UNDBFINBD <br /> T,TS 25.43 41.68 0,14 0,35 1,19 sand to silty snnd <40 30-32 10 UNDBFINBD <br /> 8.00 26.25 41.49 0.02 0.06 1.23 snnd to silty saad t40 30-32 10 UNDBFINBD <br /> 8.25 27.01 40.08 0,18 0.44 1.21 saod to silty snnd t40 30-32 !0 UNDBFINBD <br /> 8.50 27.89 40.10 0.20 0.49 1.30 silty snnd to sandy silt t40 30-32 13 UNDBFINBD <br /> B.TS 28.11 38.44 0.19 O,SO 1.34 silty sand to sandy silt <40 t30 12 UN08F[NBD <br /> 9.00 29.53 31.22 0.28 0.90 1.18 silty saad to sandy silt t40 t30 10 UNDBFINBD <br />' 9.25 SO.3S 3fi,31 0.20 0.54 1.42 silty saod tc sandy silt t40 t30 12 UNDBFINBD <br /> 9.50 71.11 35.01 0,22 0.63 1.46 silty sand to sandy silt t40 t30 11 UNDBFINBD <br /> ---°------- ---------- -------------- -----•- ---•°--------- ------° °a---g------ ------------------- -------- --------- ----- ----------- <br /> Dr - All sands (7aaialkorski et al. 19851 PRI - Du r una lu and Kitchell I37S Su: Nk- 12.5 <br />' 02 <br />tttr <br /> ttrr Nate: For interp retation purpo ses the PLOTTBD CPt PROF[LB sho uld he used rich the tABULATBD OU7PUt [ raa CPTIN TRI ( v 3. <br />1 <br />1 <br /> <br />