Laserfiche WebLink
<br />ENGINEERING <br />CO <br />165 S. UNION BLVD. • SUITE 650 <br />LAKEWOOD, COLORADO 80228 <br />(303) 980-6155 <br />July 23, 1990 <br />lfr. Robert Lazier <br />Reclamation Resources <br />P.0. Hox 152 <br />Fraser, CO 80442 <br />RE: Project No. 90-13.1 Reclamation Resources <br />Alma Placer !fine Amendment Approval, Permit Ho. 1f85-029 <br />Dear lfr. Lazier: <br />Transmitted herexith is our response to the limed Land Reclamation <br />requirement as set forth by the limed Land Reclamation Division in <br />29, 1990 letter stating conditions of ammendment approval. Item n <br />required that you provide the Division with certification from a 1. <br />professional engineer certifying the pond embankment xas built as <br />• We have included this information in this report and it is being t. <br />to you as well as to the limed Land Reclamation Division. This in <br />includes the summary and reports of the final inspections for the <br />report from Fox Consultants and the maps showing the construction. <br />soils and design information and a summary of the project has been <br />this letter of transmittal and should satisfy the requirements for <br />Four of your present permit. <br />As for items number one and two, we will continue to work with the <br />the boundaries, using orange stakes, and also we will schedule a t <br />Concerned Citizens of Alma within sixty days of the permit time. <br />We will remain available for questions if you have any in ref <br />facility. Thank you for your time and consideration in this ^ <br />~~~~~ <br />Fred C. Ladd <br />President <br />FCL:cev <br />Enclosure <br />1NG ENGINEERS <br />D SURVEYORS <br />.heir June <br />fiber tour <br />ensed <br />signed. <br />msmitted <br />rnation <br />,m, the <br />All tee <br />ncluded in <br />tem number <br />larking of <br />p with the <br />to this <br />• cc: D. Ducommun <br />