My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33131
DRMS
>
Back File Migration
>
Report
>
REP33131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:09:29 AM
Creation date
11/27/2007 6:25:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/14/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS PROJECT PN M-88-112 1993 TAILINGS DISPOSAL AREA EMBANKMENT LI
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiiiiiiiniiiiii <br />BATTLE MOUNTAIN RESOURCES, ]NC. <br />Cis-' -;1.'~i) <br />July 12, 1993 <br />J U L 14 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology 9~,1TlE Mp,1NTAIN <br />1313 Sherman Street, Room 215 i~,e~,,.,,. , ,.,..~,.._....,._.,,yy ocawANv <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />Permit No. M-88-112 <br />1993 Tailings Disposal Area Embankment Lift <br />Dear Mr. Oehler: <br />Battle Mountain Resources, Inc. (BMRI) - San Luis Project has <br />initiated work on the first embankment raise of the tailings <br />disposal area. The conceptual design and stability analysis <br />were presented in the San Luis operating permit amendment. As <br />discussed in Section D.6 of the amendment, prior to <br />construction of the raise, geotechnical testing of th~ in-situ <br />tailings material was performed to verify the concept al <br />design. <br />Packages). <br />Steffen Robertson and Kirsten (U.S.), Inc. (SRK), the tailings <br />facility design engineers, have prepared the geotechnical <br />investigations, stability analysis, and final design 3teport <br />(Phase II, Raise 1 Design Report) and the technical <br />specifications report (Earthwork and Liner Installation <br />Three copies of the Design Report and three copies of the <br />technical specifications are being submitted to the Division <br />with this letter. <br />The information collected during the field investigations was <br />incorporated into the conceptual engineering design to refine <br />the original embankment model. Stability analyses of the <br />refined model confirms the conceptual raise design as <br />presented in the permit amendment. The embankment lift will <br />be constructed as designed and approved in the amendment. <br />The following is a brief construction schedule for the <br />embankment lift. The earthwork and liner installation <br />contracts will be awarded the week of July 12. Earthwork <br />contractor mobilization will begin the week of July 19. <br />A SUB.SlDlAFY OF BA1T/.F. MUUA7dlN PULP COMPANY <br />P.O. BOX 310 SAN LUIS, COLORADO RI IS?-0310 (719167_J363 FAX (719) 67?-3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.