Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />May 22, 1997 <br />RECEIVED <br />MAY 2' ~ 1991 <br />Mr. Jim Di11ie L)NIdIGM tli MIflOfilOM~19o~PB1 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />May 18 - May//24, 1997 <br />Dear Mr. Dillies ~}~ j' <br />Attached is a summary of the on-site cyanide analysis performced on <br />samples from the tailings pond and the collection pond during the week <br />of May 18 - May 24, 1997 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.12 ppm CN-wad arad 0.25 ppm <br />CN-total. The collection pond averaged 0.04 ppm CN-wad and 0.27 ppm CN- <br />total. <br />S~rely, <br />Ron Z walt <br />cc: Anne Baldrige <br />Dan Robertson <br />