My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP33043
DRMS
>
Back File Migration
>
Report
>
REP33043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:09:18 AM
Creation date
11/27/2007 6:23:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Report
Doc Date
10/27/1988
Doc Name
1987 AHR REVIEW RESPONSE
From
CYPRUS YAMPA VALLEY COAL CORP
To
MLRD
Annual Report Year
1987
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. David Berry <br />October 26, 1988 <br />Page 2 <br />CYVCC RESPONSE: <br />The 1987 sampling program was discussed with the Division and approval <br />obtained for sampling bedrock wells in December. It was the intent for the <br />December sample to satisfy the year's monitoring requirements. CYCC <br />understood that two samples would be collected during 1988 to satisfy the <br />current water year's monitoring requirements. As previously agreed upon, <br />CYCC will obtain two full suite analyses from the bedrock wells during 1988. <br />In reference to carbonate, it is not reported when the pH is below the <br />carbonate end point (8.3 pH) for the alkalinity titration. The reason being <br />that all carbonate values are zero at or below this end point. <br />MLRD CONCERN: <br />Spoil Wells <br />Well 008-SP-5A - <br />A total of four field parameter measurements were obtained from this <br />well; however, two were obtained in May 1987, while no measurement was <br />taken during the last quarter of the water year. the approved <br />monitoring plan is designed to provide one set of such measurements for <br />each quarter of the water year. Please explain this deviation from the <br />approved plan. <br />Other missed sampling constituents are as follows: <br />Carbonate - all samples <br />Ammonia - 10/86 <br />CYVCC RESPONSE: <br />Well 008-SP-5A - <br />In reference to carbonate and ammonia, the appropriate calculations have <br />been completed and the data base updated to include the parameters. The <br />updated report for this well is attached. Four field measurements were <br />obtained in the 1987 water year. These were 10/86, 1/87, 5/87 and 7/87, and <br />have been incorporated into the data base. <br />CMLRD CONCERN: <br />Well 008-SP-4A - <br />This well has been dry since installation. Please consider installing <br />another well that can be used to monitor water in the spoils. A <br />location lower in the drainage should be chosen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.