Laserfiche WebLink
f f <br />CASTLE CONCRETE COP1PANY'S <br />MINED LAND RECLAMATION <br />1985 ANNUAL REPORT FOR: <br />PIKEVIEW QUARRY <br />PERMIT NUMBER: 77-211 .~- <br />~' ,..~~, <br />DATE OF INSPECTION FOR DATA IN REPORT: MAY 2, 1985 AND MAY 9, 1985 .:.~ <br />.~ .. ,y <br />SUI~IARY: Changes at this mine in the last year were relatively minor. <br />Mining expanded slightly southward in Tract AB. An expansion of the <br />plant site was approved and nearly completed. Reclamation work involved <br />mainly spot planting of previously planted areas and stabilization of <br />topsoil stockpiles. <br />RULE 2.41(1): LOCATION AND NUMBER OF ACRES AFFECTED DURING THAT YEAR. <br />The annual report map shows the various areas where activity <br />occurred. Generally, mining occurred over an area of about 7 acres. <br />Most of that mining occurred in the Tract AA area, but some preparation <br />and extraction occurred on or slightly south of the Tract AA/AB <br />boundary. No mining has begun in Tract AC. <br />The new Castle Concrete Office was completed and in full operation. <br />A small addition was planned for the shop. This will be a small <br />building attached to the existing building. It will house a machine <br />shop. <br />RULE 2.41(2): LOCATIONS AND NUMBER OF ACRES RECLAIMED FOR THAT YEAR. <br />During 1985 little land was actually reclaimed. Attention was <br />primarily applied to maintenance of the land reclaimed the previous <br />year. Spot seeding of weak growth areas occurred on most of these <br />areas. The large topsoil stockpile in the southeastern corner of the <br />quarry was graded and seeded. Also, the roadsides of the Pikeview Road <br />above the new office were seeded. Unfortunately, a small portion of <br />this was disturbed shortly after seeding. That area will need to be <br />reseeded next year. <br />A small technical revision was approved regarding a road from the <br />Castle Concrete Office site to the Mountain Shadows area to the south. <br />In March this road was constructed and the roadsides were seeded shortly <br />after the construction was finished. <br />1 <br />