Laserfiche WebLink
r.~ <br />Fill No. 8 Page 2 of 2 <br />DOCUMENTATION <br />Photographs documenting fill placement techniques and topsoil stockpile locations are attached. <br />CERTIFICATION <br />This is to certify that Fill No. 8 construction is proceeding in accordance with designs as proposed by CTL <br />Thompson in their report dated Apri127 and amended July 27, 2001 and approved by the Division of <br />Minerals and Geology. <br />~~.~~f <br />Ronald G. Thompson <br />Inspector <br />Charles W. McGlothlin ~~ ;~'• <br />Professional Engineer - ~ ' <br />>, <br />