Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />August 2003 Monthly Report <br />Page 2 <br />During August, the West Pit water treatment plant operated efficiently discharging a total <br />of 9,784,000 gallons (30.03 acre-feet) of water to Rito Seco Creek, a total of 965,100 <br />gallons (2.96 acre-feet) of water was transferred from the water treatment plant to the <br />tailing impoundment, and seepage along Rito Seco Creek remained dry. The monthly <br />precipitation accumulation for August was 2.45 inches, with the largest accumulation <br />(i.e., 0.91 ") occurring on August 26"'. <br />Table 1-August 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 8/29/03 44.78 <br />M-6 8/29/03 Dry <br />M_7 8/29/03 Dry <br />M_g 8/29/03 Dry <br />M-9 8/29/03 141.92 <br />M-10 8/29/03 26.08 <br />M-11 R 8/29/03 44.95 <br />M-12 8/29/03 179.60 <br />M-13R 8/29/03 131.19 <br />M-14 8129/03 136.39 <br />M-15 8/29/03 82.76 <br />M-16 8/29!03 23.44 <br />M-19 8/29/03 24.96 <br />M-21 8/29/03 18.69 <br />M-22 8/29/03 17.27 <br />M-26 8/29/03 17.17 <br />M-32 8/29!03 48.17 <br />M-33 8/29103 46.22 <br />M-34 8/29/03 22.47 <br />BF-4 8/29/03 25.75 <br />BF-6 8/29/03 31.77 <br />LS-1 8/29/03 Dry <br />LS-2 8/29/03 Dry <br />LS-3 8/29/03 Dr <br />LD-1 8/29/03 D <br />LD-2 8/29/03 Dry <br />LD-3 8/29/03 Dr <br />