Laserfiche WebLink
16 NUSKIN CONSTRUCTION CO. RECEIVED <br /> P.O.BOX 61 <br /> WETMORE,COLORADO 81253 <br /> 719-784-0415 OCT 19 2001 <br /> 719-546-2143 FAX Division of Minerals and Geology <br /> 10-17-01 <br /> DIVISION OF MINERAL AND GEOLOGY <br /> DEPARTMENT OF NATURAL RESOURCES <br /> 1313 SHERMAN ST. ROOM 215 <br /> DENVER, COLORADO 80203 <br /> RE: ANNUAL REPORT FOR PERMIT NM. M 2000-118 <br /> 1. AS OF THIS DATE EROSION CONTROL BERMS HAVE BEEN PLACED AS <br /> SHOWN. . <br /> 2. ALL TEMPORARY GRADING OF THE SITE IS COMPLETED AND ALL <br /> TOPSOIL HAS BEEN REPLACED. <br /> 3. THE AREA SHOWN HAS BEEN SEEDED WITH A BLEND CONSISTING OF <br /> 30% CLOVER, 20% CRESTED WHEAT, 20%WESTERN WHEAT, 15%DRY-LAND <br /> BROM AND 15% GRAMA ON SIX INCHES OF REPLACED TOPSOIL THAT WAS <br /> STOCKPILED DURING THE MINING OPERATION. . <br /> 4. GROWTH FOR THE 2000 SEASON HAS BEEN MINIMAL DUE TO THE DRY <br /> CONDITIONS. <br /> 5. THE FINANCIAL WARRANTIES SUPPLIED BY US AND THE LYNDEN <br /> COMPANY ARE STILL IN EFFECT. <br /> 6. NO MINING WAS DONE FROM 6-16-00 TO THE PRESENT. STOCKPILES <br /> CONSIST OF MATERIALS TO BE SOLD. <br /> IF THERE ARE ANY QUESTIONS, PLEASE CONTACT OUR OFFICE. <br /> IN <br /> D HUSKIN CONSTRUCTION CO. <br />