My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-12-28_REPORT - M1973007SG
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1973007
>
2005-12-28_REPORT - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:40:33 AM
Creation date
11/27/2007 6:21:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Report
Doc Date
12/28/2005
Doc Name
Annual Fee/Report/Map
From
Continental Materials Corporation
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Daniels Sand Pit <br />2005 Annual Report <br />Continental Materials <br />(Transit Mix Concrete) <br />M-1973-007-SG <br />Overview of Permit Year: Throughout the 2005 year, activity at the site remained <br />steady due to the active construction materials market. Mining has proceeded <br />eastward through the pre-amendment 4E area. Transit Mix received approval from <br />the Division on an amendment which added the "little Johnson" area, which is <br />directly east of phase 4E. Due to some county and city road planning issues Transit <br />Mix has had to wait to amend the current Special Use Permit. This wait will cause <br />Transit Mix to begin mining in the phase 5E area. The west side has not changed. <br />Annual Report Maps: Enclosed are two maps, one is for the East side and one is <br />fox the West side. The maps have been updated for the 2004 year. <br />Affected Lands: Please refer to the enclosed maps for affected land acreage. <br />Revegetation: The site is stable and not subject to erosion. <br />Expected Activity (2005): Transit Mix expects to be mining in phase 5E by the first <br />quarter of 2006. The direction of mining in this phase should be north and west. The <br />amount of activity at the site should continue to be steady, given the current <br />construction market. Transit Mix has scheduled to begin reclamation in the southern <br />part of phase 3E in 2006 and 2007. <br />Bonding: This operation is covered by aself-bonding arrangement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.