Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />2000 Annual Hydrology Report <br />DH-67D Hubbard Creek -Monitor] <br />Depth - 324.8' Pipe 1.6' Above Ground Top of Pipe Elevation - 6450' <br /> <br />Water Elevation (Feet) 11130100 <br />6aso <br />Depth to Water (Feet) o . o <br />pH (Standard Units) e. e <br />Conductivity (umhos/cm) 19so <br />Temperature (C) 11 . z <br /> <br />Ground Water <br />11/302000 to Present <br />Baseline <br />Min Max Avg <br />6950.0 6450.0 6950.0 <br />o.o o.o a.o <br />B.9 9.9 8.9 <br />3450.0 7x50.0 ]450.0 <br />33.2 11.2 ll.z <br />196a 395a 7asa <br />7360 J360 1160 <br />9a 94 9a <br /><FIDL <P10L <!IDL <br />610 610 610 <br />4920 9920 9920 <br /><tADL <IaOL <I9DL <br /><f~mL <FIDG <PIDL <br /><l1DL <PIDL <r~mL <br />J 0.90 70.90 J0.50 <br />a.J B.l a.l <br /> <br />0.360 0.360 0.160 <br />0.11] 0.117 0.11'! <br />3130 3130 1130 <br />97.90 9J.a0 97.80 <br />300 J00 300 <br />0.019 0.019 0.019 <br /><t~L <f~mL <MD1L <br />36.7 76.7 36.7 <br />3.13 3.11 3.13 <br />99.30 99.10 99.10 <br />30.2 10.2 10.2 <br />0.150 0.190 0.190 <br />2.510 2.510 2.510 <br />ct~mL <l~mL <DmL <br /><t~mL <FIDL <M1mL <br />1150.0 1150.0 1190.0 <br />0.13 0.11 0.13 <br />Operational <br />Baseline Inlormation Collection initiated on 11/30/2000 and not yet considered wmplete after monitoring for -1 mm~ths. Point DH~670 has not been in0uenrzd by mining. <br />The monilodn9 point location tar DH-67D is located along Hubbard Creek Vail, near Oie mouth of Dove Gulth. <br />MDL =Method Determination Limit BLANK =Not Tested Monitoring Point Table 103 <br />Requiretl by curtent pennil. <br />