Laserfiche WebLink
<br />ANNiJAII, R]EP~RT <br />~ISTR~JCTQ®NS <br />llll:~ <br />According to C.R.S. 34-32-116(3), and C.R.S. 34-32.5-116(3)(a), on the anniversvy date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br />reclantation accomplished to date and during the preceding year, new disturbances that are anticipated ro occur <br />during the upcoming year, and reclantation that will be performed during the upcoming year. Please attach such <br />a repott and map to enclosed annual report fornt. (An adequately labeled map that cleazly delineates and includes <br />the above elements ntay suffice for a written report.) <br />ff your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required bV 2 CCR 407- I, 407-4, and Rules <br />1 13.7(1)(a): <br />(I) the condriion of the operation at the time of cessation, <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following ittformation with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(I) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(I)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1. I5(I)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property vahte, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />attd the value of the property subject to either of these instruments. <br />Ttte report shall also provide proof [hat there are no past-due property taxes. <br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(iv) Per [he requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Pnority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.IS(I)(c), all monitoring information <br />required as part of the approved permit application, to include Enviromnental Protection Plan. <br />(Please note [hat if you are not a Desigttated Mining Operation, you will not have au Environmental <br />Protection Plan as part of your approved permit. ) <br />~~ <br />