My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32708
DRMS
>
Back File Migration
>
Report
>
REP32708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:49 AM
Creation date
11/27/2007 6:19:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
9/22/2006
Doc Name
2005 Annual Hydrology Report
From
HydroGeo Inc
To
DRMS
Annual Report Year
2005
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drafr West Elk Mine 2005 Annual Hydrology Report 6 <br />3.0 HYDROLOGIC MONITORING <br />The hydrologic monitoring program for the Project includes monitoring surface water resources, <br />springs and seeps, ground water resources, the underdrain, and pertinent mine water sites. Routine <br />monitoring includes collecting field water qualiTy data (pH, electrical conductivity (EC), and <br />temperature) three times per year and collecting samples for laboratory analysis annually. .Flow <br />or water level measurements are collected three times per year. The three monitoring periods <br />correspond with the rising limb period between April 3rd and May 13d', the peak flow period <br />between April 21s' and June 26d', and the low flow period between July lOd' and October 8"'. <br />A separate baseline monitoring schedule is followed for approximately one year prior to mine <br />development or two years prior to permit approval for newly added monitoring sites. The baseline <br />schedule involves collecting field water quality data, recording flow or water level measurements, <br />and collecting samples for laboratory analysis of permit-specified water quality parameters on a <br />monthly basis. Site accessibility and mine development timing are considered when detemuning <br />baseline schedules. Baseline monitoring is typically conducted monthly from April through <br />October. Since most areas at the West Elk Mine area are inaccessible through the winter months, <br />baseline monitoring is unfeasible and is typically not required from November through March. A <br />• summary of the routine and baseline monitoring schedule frequencies is presented in Table 1. <br />Table 1. Monitoring Frequencies 1'I <br />Routine Monitorin Baseline Monitorin <br /> <br />Month Flow / <br />Level Field <br />Parameters Laboratory <br />Anal sis al <br /> Janua <br /> Februa <br /> March <br />Rising Limb - Apri13 to May 13 Aril X X <br />Peak Flow - Apri121 to June 26 Ma X X <br />Low Flow -July 10 to October 8 June X X <br /> Jul X X <br /> Au ust X X <br /> Se tember X X <br /> October X X <br /> November <br /> December <br />"' Per discussion vnth J. Burnell, CllMG, 2005 <br />cz> Site Specific Schedule <br /> <br />September 2006 HydroGeo, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.