Laserfiche WebLink
<br />NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 6 <br />Ctient: Bower Brothers Construction <br />Work Performed: <br />Date: 9/7195 <br />Time: 1.5 <br />Mileage: 22 <br />EngrJTech: JK <br />As requested, we visited the prolect site on this date, however, the excavation contractor, Bower Brothers, was <br />not ready for compaction testing. <br />Remarks: <br />A sample of the waste coal was obtained for Standard checkpoint Proctor testing. The results matched a <br />previous curve for this prolect. In addition, a sample of rip-rap bedding material (No. 3) was obtained for gradation <br />analysis. The checkpoint matched a previous Proctor for this job (Sample No. 2) and the gradation test results <br />are attached. <br />Verbal Discussions: <br />We discussed frequency of future testing and required procedures with Bud Bower of Bower Brothers. <br />