Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 7 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 9/11!95 <br />Time: t.5 <br />Mileage: 22 <br />Engr./Tech: JK <br />As requested. we visited the project site on this date antl conducted nuclear density test No.'s 21 through 26 on <br />the matenal being placed. <br />The excavation contractor. Bower Brothers Construction, had placed and compacted 4 feet of processed waste <br />coal in the northeast area of the waste coal pile. <br />Remarks: <br />The material tested generally met project specifications with moisture contents being 4.6% below to 2.9% above <br />optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was notified of today's test results. <br />