Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />location: Foidel Creek Mine Report No.: 8 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 9/21/95 <br />Time: 2.0 <br />Mileage: 22 <br />EngrJTech: JK <br />As requested. we visited the protect site on this date and conducted nuclear density test No.'s 27 through 30 on <br />the material being placed. <br />The excavation contractor. Bower Brothers Construction, placed and compacted a feet of processed waste coal <br />along the toe buttress aver the second phase of the wash rock drain recently installed. Samples from each test <br />area were ootained and returned to our laboratory for moisture content determination. <br />Remarks: <br />The material testetl generally met protect specifications with moisture contents being 2.2% to 5.0% above <br />optimum. <br />Ptease refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was notified of today's test results. <br />