Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 10 <br />Client: Bower Brothers Construction <br />Work Pertormed: <br />Date: 10/10/95 <br />Time: 2.0 <br />Mileage: as <br />Engr.lfech: JK <br />As requested. we visited the project site on this date and conductetl nuclear density test No.'s 35 through 37 on <br />the matenal being placed. <br />The excavation contractor, Bower Brothers Construction, placed and compacted a-feet of processed waste coal <br />above the natural grade in an area west of the toe drain. We obtained a sample of waste coal from the test site for <br />checkpoint Proctor determination. The checkpoint matched a previous curve for this iob. <br />Remarks: <br />The material tested generally met proiect specifications with moisture contents being 0.2% below to 3.4% above <br />optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was notified of today's test results. <br />