Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pife Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 11 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 10/13/95 <br />Time: 2.0 <br />Mileage: 14 <br />EngrJTech: JK <br />As requested. we visited the project site on this date and conducted nuclear density test No.'s 38 through 41 on <br />the material being placed. <br />The excavation contractor. Bower Brothers Construction, placed and compacted 4-feet of processed waste coal <br />above the na[ural grade in an area west of the toe drain. We obtained a sample of waste coal from the test site for <br />checkpoint Proctor determination. The checkpoint matched a previous curve for this lob. <br />Remarks: <br />The matenal tested generally met protect specifications with moisture contents being 1.8% to 3.0% over optimum. <br />Please refer to the artached sheet for results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was notified of today's test results. <br />