Laserfiche WebLink
<br />6) Two survey points were located above Section no.l North with <br />2 control points to the south over unmined ground. <br />7) These inspections were made in the company of Clifford Schmid, <br />P.L.S. All points in both areas of fracturing will continue to <br />be monitored on a weekly basis both visually and by instrument. <br /> <br />Fred M. Jo s C.P.G. <br />(2) <br />