My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32345
DRMS
>
Back File Migration
>
Report
>
REP32345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:29 AM
Creation date
11/27/2007 6:12:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
5/2/1983
Doc Name
CREEK ALLUVIUM
From
MLRD
To
COLOWYO COAL CO
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~. 3. Groundwater/Alluvial Groundwater?,- Colowyo currently has~tNg <br />groundwater monitoring wells completed Grithin Streeter Fill}~~one~ <br />alluvial well completed in the`Goodspring Creek}.a=ll.uvinuuup- <br />stream from Streeter Fill, and~'one'lalluvial well completed in the <br />~6oodspring Creek alluvium at the base of Streeter Fill. Coloveyo <br />will conduct monitoring and sampling of the above four wells and <br />will install, monitor, and sample an additional well adjacent to <br />Wilson Creek. The proposed well location is dorm gradient from <br />the Gossard Load out and will be completed during the summer of <br />1983. Estimates indicate the free water zone will be at <br />seventeen feet. The proposed well location is shown on Water <br />Monitoring Sites For Permit No. C-019-81 (Map 37) and proposed <br />well completion is shown in Figure 1. <br />In accordance with the September 28, 1982 "Proposed <br />Decision and Findings of Compliance For The Colowyo Coal Company <br />Colowyo Mine", all of the wells will be sampled quarterly as <br />listed below. <br />uarterly Samolino For: <br />a. PH <br />b. Conductivity at 25oC <br />c. Total Dissolved Solids <br />d. Bicarbonate (HC03) <br />e. Calcium (Ca+ ) <br />f. Magnesium (Mg+2) <br />g. Amm~~ia (NH3) <br />h. Nitrata <br />i. Phosphate (POq-3as P) <br />j. Sodium (Na+) <br />k. Sulfate (SOq) <br />1. Arsenic (As) <br />m. Iron (Fe) <br />n. Lead (Pb) <br />o. Manganese (Mn) <br />p. Mercury (Hg) <br />q. Selenium (Se) <br />r. Zinc <br />s. Water Level <br />Colowyo looks forward to continued cooperation with M.L.R. D. and <br />will consult with M.L.R. D., after the first annual report is submitted, in <br />effcrts both tc evaluate the applicability of all parameters chosen and <br />fre;uency of monitoring in accordance with the September Z8, 1982 "Proposed <br />Decision and Findings of Compliance For The Colowyo Coal Company Colowyo <br />Mine"; and identify any peculiar site specific conditions. <br />Upon receipt of the Divisions approval of the new portions of the <br />above monitoring plans, Colowyo will implement the new provisions of the <br />plans. Since the new provisions were contemplated in the September 28, <br />4.05-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.