Laserfiche WebLink
<br />1 <br /> that these be read periodically thereafter, say at <br /> three-mon th intervals. If, as expected, no build-up <br /> of water occurs, then no further action would be <br /> required. In tl~e unlikely event that water did begin <br /> to build this would probably occur rather slowly <br />up <br />' d th , <br />n and execute <br />t ti <br />l <br />ld b <br />ffi <br />i <br />t <br /> an <br />ere me <br />o p <br />a <br />wou <br />e su <br />en <br />c <br /> remedial measures. <br /> <br /> We trust that the above discussion satisfies your require- <br />, ments for the evalu ation of dump stability. However, please <br /> call us if you have any further questions. <br /> <br /> Very truly yours, <br />GOLDER ASSOCIATES, INC. <br />^~ <br />' R.L, lum <br />. Gass <br />1 <br />RLP:nh <br />S78252 <br /> <br /> <br />1 <br />1 <br />1 <br /> <br />9 <br />Golder Associates <br />