TABLET
<br />SoulhtieW Mine
<br />SEMI-ANNUAL SUBSIDENCE MONITORING DATA SUMMARY
<br />PERIOD: MAY 1, 1995 through OCTOBER 31, 1995
<br />Lueal Survry Dab: 10195 Prcvir¢w SLrvey Due; 4195 Original survey Dam: 3/83
<br />VERTICAL & HORIZONTAL CHANGE VERTICAL & HORIZONTAL CHANGE
<br />FROM ORIGINAL SURVEY FROM PREVIOUS SURVEY
<br />Monument Lalast Survey Vertical Horizonml Previous Survey Vertical Horizontal
<br />No. Elevation (FO Chan a (Ft) Chan a (FO Elevation (FO Chan a (FO Change (Fq
<br />1 6,552.30 -0.74 0.43 6,552.31 -0.01 0.09
<br />2 6,557.83 -0.81 0.42 6,557.82 0.01 0.11
<br />3 6,566.59 -1.10 0.41 6,566.61 -0.02 0.14
<br />4 6,373.83 -1.36 0.43 6,573.86 -0.03 0.19
<br />5 6,541.65 -0.79 0.46 6,541.65 0.00 0.07
<br />6 6,482.20 -0.89 0.45 fi,482.23 -0.03 0.07
<br />7 6,453.55 -0.75 0.33 6,453.57 -0.02 0.0J
<br />8 6,539.97 -0.75 0.47 6,539.93 0.00 0.11
<br />9 6,533.88 -0.72 0.52 6,533.89 -0.01 0.10
<br />10 6,326.98 -0.71 0.49 6,326.97 0.01 0.11
<br />II 6,519.93 -0.76 0.57 6,519.93 0.00 0.09
<br />12 6,512.83 -1.04 0.89 6,512.82 0.01 0.10
<br />13 6,504.88 -1.50 1.00 6,504.89 -0.01 0.13
<br />14 6,494.30 -2.00 0.91 6,494.30 0.00 0.15
<br />IS 6,483.72 -2.31 0.85 6,483.73 -0.01 0.13
<br />16 6,546.95 -0.50 0.50 6,546.97 -0.02 0.13
<br />17 6,535.58 -0.38 0.95 6,535.61 -0.03 0.10
<br />IB 6,329.26 -0.29 0.54 6,529.27 -0.01 0.09
<br />19 6,535.43 -0.19 0.51 6,535.4) 0.00 0.09
<br />20 6,566.03 -0.12 0.62 6,566.04 -0.01 0.19
<br />21 6,580.89 -0.09 0.67 6,580.91 -0.02 0.22
<br />22 6,563.12 -0.05 0.70 6,563.13 -0.01 0.13
<br />2I 6,534.51 -0.OB 0.76 6,534.52 -0.01 0.15
<br /> FLORENCE WATER LINE t3rigidl sway Dab: s/85,
<br />lama Survry Dam: lags Prwm[s Survey Deb: 7/95 ~ 1a87, 1/94
<br /> VERTICAL&HORIZONTAL CHANCE VERTICAL&HORIZONTAL CHANGE
<br /> FROM ORIGINAL SURVEY FROM PREVIOU S SURVEY
<br />Monumeol lalrst Survey Vertiud Horizontal Prcvioua Survey Vertical Horiwnml
<br />No. Elevation (Fq Change (FO C e (FQ Elevation (FO Chan a (FO Change (FO
<br />B 6,432.12 O.12 0.44 6,432.13 -0.01 0.14
<br />C 6,477.82 -0.31 0.86 6,477.90 -0.OB 0.10
<br />D 6,554.29 -0.IB 0.09 6,554.40 -0.11 0.19
<br />E 6,632.09 -1.54 2.02 6,632.09 0.00 0.32
<br />F 6,298.54 -0.36 0.23 6,298.75 -0.21 0.22
<br />G 6,264.49 -0.06 O.IS 6,264,51 -0.02 0.08
<br />H 6,279.91 -0.37 0.34 6,239.90 0.01 O.I6
<br />[ a~nR OC _~nR nzv R~nR ea nm nn
<br /> THOMPSON RANCH STRUCTURES
<br />Lunt sway Dam: lags Prwiau Survey Deb: 719s , ~ Origi¢al Snrvey Dam: s/RS
<br /> VERTICAL & H ORIZONTAL CHANGE VERTICAL 8c HORIZONTAL CHANGE
<br /> FROM ORIGINAL SURVEY FROM PREVIOUS SURVEY
<br /> I~text SLrvey Vertical HorizonW Previous Survry Vertical Horizoourl
<br />Swcnue Elevatoo (FO Chm a (FO Chen a (FU Elevation (FO Chao a (FO Chan a (FO
<br />N. Houx 6,767.40 0.05 0.10 6,367.38 0.02 0.03
<br />S. House 6,372.02 0.08 0.11 6,372.00 0.02 0.07
<br />Bem 6,383.44 0.04 0.08 6,383.42 0.02 0.13
<br /> NEWLIN CREEK POINT
<br />Labat Survey Deb: lags Praviam survey Dam: 7195 Origmel Survq Dam: 5/BS
<br />VERTICAL & HORIZONTAL CHANGE VERTICAL & HORIZONTAL CHANGE
<br />FROM ORIGINAL SURVEY FROM PREVIOUS SURVEY
<br />Latest Survry Vertical HorizonW Prcviolss Survry Vertical Horizonal
<br />Elevuron (FO Chance (FO CWn¢e (Ftl EMation (Ftl Chmee IFII Chance IFtI
<br />
|