Laserfiche WebLink
• / • <br /> <br /> <br />ANNUAL REPORT <br />July 2000 <br />Permit #M-81-075 <br />In the past year we have removed approximately 1,200 tons of stone. Quarry #i has <br />produced most of the stone this year. We returned to the east side of permit (see map) and went <br />down approximately three (3) feet. We are also working in the west side. Areas on the map in <br />boxes show work, and circles are reclamation. <br />na UJ <br />y Q ~s f \ N <br />~ ~ <br />~~ <br />DOd 0000 <br />®DC~ f~fJO <br />The plan for this year is approximately 1,000 tons from the same area. Quarry #2 witl <br />soon need to move west approximately fifty (50) feet. In this quarry we reclaim as we work. We <br />keep piles of waste to a minimum. As we take out stone, we replace rubble in the hole. This is a <br />very small operation, approximately three (3) or four (4) workers. Most work is done by hand. <br />We own this land, so reclamation is important to us also. Seeding to stop erosion is done yearly. <br />Over two (2) acres has been reclaimed on the east side of quarry #2. These quarries are <br />approximately 100 years old, so new disturbances are small. Quarry #2 will soon need an <br />amendment to move west approximately fifty (50) feet. <br />la <br />If you have any questions, please feel free to contact Joe Phillips at (303) 823-6395. <br />.~~ <br />