Laserfiche WebLink
r <br />~ EXHIBIT C <br />Pre-Mining and Mining Plan Map <br />LSGBND <br />u <br /> <br />t <br />~ !- ~ Direction of Mining Operation <br />I - - - IPre-Disturbed Mining Area <br />,,,,,,.,.~,.,,,,c.,~,~.,..~,~~ Area to be used for mining, processir <br />and stockpiling of materials <br />I New access road <br />~ - - -'-- <br />_ .,, - ,,,_.,, _ ., ~ Areas moat likly to stockpile topsoil <br />and subsoil <br />Barb wire fence <br />!Property boundry, No fence <br />i <br />'Two-Track Road <br />1. Mining and systematic reclamation will be in phases <br />proceeding west from pre-disturbed site. A slope of 4:1 <br />will be maintained during mining to prepare for reclamati <br />2. The lower floor Qf the pit will be the normal area for <br />stockpiles of procceased materials and for proccessing <br />plants. 1 <br />~ 3. Barb wire fence is located one foot inside property li <br />i of permit area. <br />4. Contour elevations are approximate. <br />~` Shc~i<<l cl~'cc. Intl\iCti~~i'~ <<ti~ckci Cli c~, c~S c l 3 •/a ' 9% <br />PRGPRRE() ~Y ~ ~'~ eNl ~~ y l4 y~ <br />I <br />