Laserfiche WebLink
<br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 3 <br />B. SITE SPECIFIC RECLAMATION COSTS <br /> <br />The following aze estimated costs of completing the reclamation of each specific sits:. Area <br />numbers aze correlated to the original reclamation map (not included with this report). Costs aze <br />1997 dollazs and the numbers given below and throughout this section aze thousand; of dollazs. <br />The individual items below were computed to the neazest one hundred dollazs in a spread sheet <br />and then rounded to the nearest thousand dollazs for this report. Acreages aze projected through <br />1997. As in the past, "buffer" represents land reserved for possible future disturbance. <br />Mine site (172 acres) <br />a) Dismantle $ 0 <br />b) Grading and site preparation. $ 186 <br />c) Revegetate 116 acres (at $2,480/acre). $ 288 <br />d) Buffer, 56 acres $_ __~ <br /> Total... $ 474 <br />2. Vent shaft (1 acre) <br />a) Secure shafr opening. $ 55 <br />b) Fertilize (1 acre at $170/acre). ~~ <br />Total... $ 55 <br />3. Portal area (28 acres) <br />a) Dismantle, close portal. $ 34 <br />b) Revegetate 3 acres (at $1,810/acre). $ 5 <br />c) Fertilize (25 acres at $170/acre, one application). ~_- ~ <br />Total... $ 49 <br />4. Surface Railroad (121 acres) <br />a) Dismantle. $ 5 <br />b) Grading and site prepazation. $ 71 <br />c) Revegetate RR bed (36 acres at $2,480/acre) $ 89 <br />d) Fertilize slopes (73 acres at $170/acre, 1 application) $ 12 <br />e) Buffer, 12 acres $ 0 <br /> Total... $ 178 <br />5. Mill yard and access roads (123 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site prepazation $ 139 <br />c) Revegetate yazd (95 acres at $1,810/acre) $ 172 <br />d) Buffer, 28 acres $ _0 <br /> Total... $ 311 <br />