My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32242
DRMS
>
Back File Migration
>
Report
>
REP32242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:26 AM
Creation date
11/27/2007 6:10:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/4/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112D-3 HARD ROCK METAL & DMO ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COSTS <br />Henderson Mine, Permit #M-77-342 <br /> <br />Many affected azeas aze being revegetated, but aze not considered totally reclaimed. Estimated <br />costs and concomitant financial warranty for such azeas are adjusted downwazd as reclamation <br />occurs and upwazd to cover additional disturbed areas. Because of the continuously changing <br />acreage and status of affected land, the Boazd stipulated that reclamation costs be updated every <br />two years in conjunction with submittal of the annual report and map. We have refined our <br />acreage estimates, our methods, and our costs. The estimated costs (in 1997 dollars) of <br />reclaiming all anticipated disturbances through 1997 is $6.387 million. <br />A. SITE TYPE CALCULATIONS <br />Mine site (computed for 15 acres), mostly comprised of a fragmented rock growth <br />medium. <br />Activity Man <br />Days Labor/ <br />Equipment Material Total <br />Site Preparation 10 $6,600 $0 $6,600 <br />Haul/spread sewage sludge 10 $4,370 $550 $4,920 <br />Haul/spread wood chips 5 $5,080 $0 $5,080 <br />Stockpiling 6 $1,090 $0 $1,090 <br />Mixing sludge and chips 6 $1,090 $0 $1,090 <br />Seed 2 $2,130 $2,460 $4,590 <br />Fertilizer 4 $2,130 $280 $2,410 <br />4,500 trees (300/acre) 21 $1,840 $2,970 $4,810 <br />600 shrubs (40/acre) 7 $960 $2,360 $3,320 <br />10 % Freight & Tax - - $870 $870 <br />Maintenance fertilize 4 $2,130 $280 $2,410 <br /> Total for 15 acres... $37,190 <br /> Cost per acre... $2,480 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.