My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-09-16_REPORT - M1994113
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1994113
>
2005-09-16_REPORT - M1994113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:37:43 AM
Creation date
11/27/2007 6:10:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
Report
Doc Date
9/16/2005
Doc Name
Annual Fee/Report/Map
From
Pathfinder Development Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PATHFINDER DEVELOPMENT <br />P.O. BOX 3332 <br />TELLURIDE, CO 81435 <br />970-728-0167 Phone 970-728-4661 Fax <br />September 15, 2005 <br />DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman St., Room 215 <br />Denver, Co 80203 <br />Dear Sirs, <br />The enclosed check in the amount of $688.00 is for the annual renewal of our permit # <br />M-1994-113. There was no mining activity inside the permitted area this year; however <br />we did finish relocating the haul road in order to comply with the San Miguel County <br />road relocation permit and the Army Corps 404 wetland relocation permit. Please see <br />map for details. Mining activities at this time aze not scheduled; however we may crush a <br />small amount of gravel in order to cover our new haul road during the month of October. <br />This year we did relocate our top soil pile stored on site for reclamation work and had it <br />hydro mulched with approved San Miguel County seed mix. As well, we also hydro <br />mulched the slope azea where material was removed and relocated to the fill area for the <br />new haul road. See map for details. <br />If we are fortunate enough to commence mining activities this next year, we will be <br />removing material from the south facing knob on the south end of the permitted area. <br />This will also be the azea where we will take material to crush for our haul road cover this <br />October, if we aze able. <br />Thank you, <br />John Dourlet <br />Vice President <br />Pathfinder Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.