My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32139
DRMS
>
Back File Migration
>
Report
>
REP32139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:17 AM
Creation date
11/27/2007 6:08:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Report
Doc Date
1/11/1995
Doc Name
1994 AHR 3 OF 4
Annual Report Year
1994
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Ms. Pacr'_ v son <br />Date <br />' Discharce Parameter(s) <br />?eint =xceedina Limit'tion Discharce Rate (cfsl at !s` <br />' 0d ~~ rSS 9d C•. ooS ~ ~ <br />Oo~ 3~~) ~<`s z Q 0.02 ~~ <br />1 <br />rxceedance of acnlicable permit effluent limitatio.^s <br />resulted = <br />' ~ ''_scharge from s:owmelt runoff occurring within 48 ho::rs <br />a===_r runoff inflows to the pond(s) have stopped <br />' (l 7ischarge from ra_nfall runoff occur_-:ng within 48 hours <br />a==er measurable precipitation has stopped <br />~ccumentation of precipitation and snowmelt occurre-ce <br />' an3 snowse:= inflows to the ponds is retained at the minesite ar.^ <br />is available for inspection by authorized agency representatives. <br />Copies of re_evant temperatsre/precipitation data are attached `or <br />^ reference. <br />?~_ sedimentation ponds are designed to contain the full <br />design =.u:of° volume resulting from a 10 year, 24 hour storm eve..*.t. <br />Stormwa=e. storage capacity is in addition to design sediment <br />storace a::d any permanent storage capacity. Kerr inspects a.l <br />sedimenta=:on ponds on a quarterly basis. Inspections inc__ce <br />evaiuatic- cf accumulated sediment levels relative to des:~n <br />sediment storage capacity =o verify that design stormwater storace <br />capacity is Maintained at all times. If inspections indicate that <br />sediment ac~,imulations are at or near the design sediment level, <br />Kerr renoves accumulated sediment from the pond(s) within a <br />reasonab_e period (typically 30 to 60 days) following the <br />inspection. Both pond inspection reports and documentation of pon3 <br />clean-out a_e retained at the minesite and are available for <br />inspect_o: by authorized agency representatives. Based on direct <br />observa=_cn of pond storace levels at the time discharge occurred, <br />the disc^ar_e resulted frcm: <br />`~ iainfall or snc•.+melt runoff volumes less than or e~.:a_ <br />~~ the design 10 year, 24 hour storage volur:e <br />(] iainfall or snc~~relt runoff volumes greater than t::e <br />resign 10 year, 24 hour storage vciume <br />
The URL can be used to link to this page
Your browser does not support the video tag.