Laserfiche WebLink
ANNUAL REPORT <br />Operator: <br />Operation: <br />File Number: <br />Anniversary Date: <br />United Companies of Mesa County <br />Pit # 3 <br />M-1977-022 <br />Mazch 28, 2005 <br />Pit # 3 was active only for stockpiling of aggregates hauled in from another location. <br />Most of the material hauled in is used for ready mix concrete. There is also a smaller <br />stockpile of roadbase that is sold as the demand calls for. <br />We have a Technical Revision pending at this time for a change in reclamation for most <br />of stage one and all of stage two. United Companies has donated approx. 19.76 acres of <br />this pit to the North Fork River Improvement Association. NFRIA plans to construct a <br />water park on the river portion of stages one and two. The plans have not been turned <br />into the DMG yet as the final construction plans are not 100% complete yet. The plans <br />should be available in the next 60 days. Stage three has been graded and revegetated. <br />United Companies will keep the current reclamation bond in place until the river park is <br />complete to insure reclamation will be done according to the existing plan should the <br />river park not be built. <br />Sincerely, <br />Ju~`b l1J , ~-~~> <br />Brent W. Ken <br />Resource Manager <br />