My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-05-03_REPORT - M1977315
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977315
>
1988-05-03_REPORT - M1977315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 5:58:08 PM
Creation date
11/27/2007 6:06:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977315
IBM Index Class Name
Report
Doc Date
5/3/1988
Doc Name
BESTWAY PAVING CO ANNUAL REPORT PN 77-315 REPORT AS OF 04/26/88
From
BESTWAY PAVING CO
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 131 A III III III IIIIIII III <br /> 999 <br /> POST OFFICE BOX 3189 <br /> _ BEST - WAY PAVING CO. GREELEY, DO <br /> ZIP CODE 806330633 <br /> GREELEY 353.1654 <br /> DENVER 623,9438 <br /> April 26, 1988 RECEIVED <br /> MAY 31988 <br /> Department of Natural Resources MIMED LAND <br /> Mined Land Reclamation Division <br /> 423 Centennial Building RECLAMATION DIVISION <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br /> Re: Best-Way Paving Co. Annual Report; Permit No. 77-315; <br /> Report as of April 26, 1988 <br /> Gentlemen: <br /> 1. Excavation of Phases 4 and 5 was completed during 1987. 30% of Phases 4 <br /> and 5 has had topsoil replaced however will not be brought to grade until <br /> the remainder of the phases are backfilled and topsoil added. Approxi- <br /> mately 42% of Phase 6, 55% of Phase 7, 42% of Phase 8, have been excavated <br /> during 1987, and extending approximately one (1) acre into Phase 12. <br /> There has been no activity in Phase 1 during the year. <br /> 2. The slope on the North side of Phase 2 has been 95% completed. The East <br /> and South slopes of Phases 2 and 3 were fertilized and seeded with the <br /> grass mixtures, quantities and fertilizers which were set forth in the 1987 <br /> report. The bottom portions of Phases 2 and 3 have not been brought com- <br /> pletely to grade as it has been necessary to utilize that area for some <br /> equipment parking due to the quantity of business activity in 1987, <br /> 3, Approximately one (1) additional acre east of present excavation will be <br /> extracted from Phase 12 during 1988. This is all the excavation that will <br /> occur in Phase 12 as we will be at our required limits to the boundaries of <br /> the property and the phase. The remainder of Phase 6 will be completely <br /> excavated during 1988. The portions of Phases 6 and 12 excavated during <br /> 1987 will have fill dirt replaced up to the topsoil stage during 1988. <br /> Phases 4 and 5 will have an additional 20-25% reclaimed, <br /> 4. It has been necessary to excavate Phases 6, 7, 8 and the small area of <br /> Phase 12 in the manner which we are working in order to reclaim those areas <br /> as required. This has been due to the small acreage area of the phases and <br /> our ability to work to depth and then properly reclaim. <br /> If any additional information is required, please let me know. <br /> Very truly yours, <br /> Carl V. Hill, Jr. <br /> President 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.