Permittee Name: Tectift Construction Co. • Page 2 <br /> P(Trmit No: M_84M9 <br /> i Operation Name:_ Bailey Pit <br /> Anniversary Date: 09 / 29 / 92 <br /> (1 cont) <br /> acres ±. We have a 34.86 ac. ± Plant Site (gray) north of the <br /> river and a staging area of 5.82 acres ± south of the river <br /> where the conveyor terminal is. This staging area is used to <br /> store pit run materials until they are loaded on the conveyor <br /> for delivery to the plant. We are using only 16. 68 acres ± of <br /> the Plant Site area at this time, the other 8 . 18 acres ± will <br /> be part of Lakes 4 and 5 (dark green) . The topsoil was <br /> stockpiled in the 100 foot setback along the river so it could <br /> be used for reclamation (pink) . <br /> (2) No reclamation was required this year. Backfilling is <br /> continuing in the WETLAND DEVELOPMENT AREA in the north lake <br /> (aqua) . We have approximately 6. 65 acres filled at this time. <br /> We planted 250 Cottonwood, 60 Russian Olives and 60 Wild Plum <br /> around the north lake this spring. These trees were bareroot <br /> stock obtained from the Forest Service. The cottonwoods did <br /> very well but approximately 50% of the Russian Olives and all <br /> of the Wild Plums were eaten by some small animal. We will <br /> replant the Plums and Russian Olives again next year. No <br /> other revegetation work was preformed this year. The list <br /> below shows the total acres under various stages of reclama- <br /> tion. We have approximately 22, 300 YD3 of soil stockpiled <br /> along the river south of the river. We estimate 7, 000 YD3 <br /> will be needed for resoiling purposes. Most of the reclama- <br /> tion in the mined areas north of the river is complete. Only <br /> the east shore of Lake 1 is left to complete at this time. <br /> This can not be done until the plant site areas is mined <br /> because we are still working in this area. <br /> a. Backfilled: 6.65 ac. (tan/aqua) <br /> b. Graded: 17 .45 ac. <br /> C. Seeded: 17.45 ac. (green) <br /> e. Lake Surface: 36.93 ac. (blue) <br /> d. Topsoil Replaced: 17.45 ac. <br /> f. Ave. topsoil depth 12. 00 in. <br /> (3) Mining will continue in the Lake 2 area we will be stripping <br /> ahead of mining. We will continue to mine towards the west <br /> property line in the 250 foot band along the river. Once we <br /> reach the west side mining will progress to the south. We <br /> expect to mine 20. 00 acres ± this year in that area (yellow) . <br /> (4) Backfilling will continue in the WETLANDS DEVELOPMENT AREA. <br /> We will continue to plant trees around the lake as required in <br /> the plan. No other revegetation is required at this time. As <br /> in the past, we will seed an area when the seedbed preparation <br /> is complete and there is no danger it will be disturbed by <br /> operations in the pit. Once we have finished mining along the <br /> river the north shore slopes will be established and graded. <br /> The soil we have stored along that side will be use to resoil <br /> the slopes. <br />