My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31982
DRMS
>
Back File Migration
>
Report
>
REP31982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:11 AM
Creation date
11/27/2007 6:05:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
5/26/1998
Doc Name
PN C-81-038 1998 1ST QTR GOB AND POND INSPECTION REPORTS
From
BOWIE RESOURCES LIMITED
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r • • <br /> <br /> <br />Bowie Resources Ltd. <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />1st Quarter 1998 <br />ttem <br />YesMo <br />Commems <br />1 Ouantily of waste material added to waste dmposal No No waste material wac added durvrg this reporting <br /> area during reporing period. period. <br />2 Waste material deposited end compected'n No No waste materiel was added dung this roportrnp <br /> 24 ir>ch 5fts7 period. <br />3 Drainage alterations constructed? Ne No drainage alteratore were constructed during the <br /> quarter. The eristing drainage paltem was meirdamed <br /> around the perimeter of the pie to protect autslopes <br /> and dved dra'vrage at the toe of the pie. <br />4 Present height of waste material? Highest height eppro>amatey 99.0 feet <br />5 New bench corstructed? No <br />6 Refuse material ouWopes placed et 1 V:2V ouLslopes? N/A No waste material was added durtrrg this reporting <br /> period. <br />7 Adequate drainage on top of completed fii? Yes <br />B Bench drainage adequate? Yes <br />9 OuWOpes covered with 4 foot non-to~dc, WA No waste material was added during this reporting <br /> noncombustible material? period. <br />10 Berms constructed on oulalopes? Yes <br />11 Evidence of structural defects? Na 1< <br />12 Topsoi edequatey salvaged and stored? WA Na add~Gonal topsoi was saHaped from this pie this <br /> quarter. <br />13 Trash removed? WA No waste materiel was added dung this reporing <br /> period. <br />14 Add~UOnal commerds? No <br /> <br />4-g7.XLS <br />I certry the above report as beirp axuratge to Vre best oT knowledge and atl fill has been constructed as <br />specfied in the design approved by the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.