My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31974
DRMS
>
Back File Migration
>
Report
>
REP31974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:11 AM
Creation date
11/27/2007 6:05:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987013
IBM Index Class Name
Report
Doc Date
5/6/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'r <br />• ~~~ ~I~~~~~~~~~~~ ~~~ • <br />Notice of Intent to Continue Mining Operations <br />110c Construction Materials Annual Report <br />Permittee Name: <br />Permit No. . <br />Operation Name: <br />Anniversary Date: <br />Total: <br />1. a. Permitted acreage <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />6. <br />9. <br />10 <br />11 <br />~P~: y/tee <br />~ K - 'Z S a S'1 <br />RECEIVED <br />I1AY 0 6 ~ggg <br />Southway Construction Company, Inc. <br />M- a~ - 013 Division of Minerals & Geobpyr <br />Burton Pit' <br />May 06, 1998 <br />$225,00 (Due on your Anniversary Date) <br />8.44 b. County where mine is located: Rio Grande <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 190 days per year? <br />Does this mine have a phased reclamation plan? <br />Total acres affected during the report year:* <br />Total acres-reclaimed for the report year:*- - - - <br />Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />Total number of acres seeded: <br />a. List species seeded 6 seeding ra[e for report year on back <br />For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />The type and approximate quantity of fertilizers <br />conditioners used Eor the report year:' N/A <br />Estimated total acres to be affected in the next report year:* Unknown <br />COMMENTS: <br />' Please show the location of the acreage for items 9 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~- <br />Please t or print current contact name, <br />Contact Name: Jim M. Burchett <br />Date: 5/5/98 <br />mailing address, and phone number below: <br />Company: Southway Construction Co <br />Address: 117 White Pine Drive <br />Alamosa,CO. 81101 <br />organic material or soil <br />~, <br />YES 0 <br />MORE LESS <br />YES NO <br />3+ <br />0 <br />0 <br />0 <br />0 <br />N/A <br />N/A <br />Phone: ~ 719 )589-5103 <br />FAx No: (719 )589-5522 <br />,Inc. <br />Federal Tax ID No. or Social Security No.: ~~1 -O(~'7~,8~ Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.