Laserfiche WebLink
<br /> <br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-116(3). and C.R.S. 34-32.5-I ] 6(3)(a), on the anniversary date of the permit each year. <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that wtll be performed during the upcoming year. Please attach such <br />a report and map [o enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annu,il Report the following information as required by 2 CCR 407-], 407-4, and Rules <br />1.13.7(I)(a): ~ <br />(I) the condition of the operation at the <br />(ii) what specific measures have been and <br />performance standards and Environmental <br />approved application; and <br />of cessation: <br />be implemented to comply with reclamation, <br />ection Plan requirements, if they are part of your <br />(iii) plans for resumption of mining operat <br />Please provide the additional following information with your Annual Report, as applicable: <br />i <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />i <br />(n Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules Ll5(I)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and th<; value of the property subject ito either of these instruments. <br />_ The_rep_ortshall also provide proof that_there are no past-due property taxes_ -,. <br />(iii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Le[[er of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2 CCR ~~407-1, 407-4, and Rules 4.4.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition,walue, and location of all pledged fixtures <br />and equipment. ~ <br />I <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules ].15(I)(c), all monitoring information <br />required as pan of the approved permit application, to include the Environmental Protection Plan. <br />(Please note th:u if you are not a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved permit.) <br />