My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31855
DRMS
>
Back File Migration
>
Report
>
REP31855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:07 AM
Creation date
11/27/2007 6:02:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
2/24/1998
Doc Name
1997 ANNUAL HYDROLOGIC REPORT
Annual Report Year
1997
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__ J. E. STOVER 8~ ASSOCIATES <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />April 17, 1998 <br />CML ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVEl7 <br />Michael Boulay <br />Division of Minerals ~ Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />APR 2 0 1998 <br />Division of Minerals & Geology <br />Re: Bear Coal Company <br />1996 AHR <br />Permit C-81-033 <br />Dear Mr. Boulay: <br />The DMG's letter dated November 20, 1997 transmitted its comments and concerns <br />regarding 8ear's 1996 Annual Hydrology Report. Following are Bear's responses to the <br />DMG's concerns: <br />1. Enclosed is revised page 3 which explains that the specific percent increase or <br />reduction in constituent concentration for wells AA-1 and AA-3 are based on 1996 <br />data compared to 1995. <br />2. A brief description of the alternate sediment control used along the slide affected <br />mine access road is presented at the bottom of revised page 4. <br />3. Enclosed is revised page 6 which presents the temperature data for the french <br />drains. Only flow was measured for FD-LS on 7/17/96 because Bear did not have <br />the necessary instruments on site for the other parameters when the flow <br />measurement was taken. ~ . <br />4. Bear did not pump water into the mine from the we{I or the river during 1996. There <br />was adequate inflow to the mine to satisfy all of the water needs of the mine. If fact <br />during April 1996, the mine inflow exceeded Bear's water needs and water was <br />discharged to the Colorado River through outfall 001. Enclosed is a new page 10a <br />which presents a demonstration of the mine water balance for the Bear No. 3 Mine. <br />Discussion was added to page 11 regarding the 1996 water balance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.