Laserfiche WebLink
<br /> <br />r ~ ANNUAL REPORT <br />,~ INSTRUCTIONS <br />~~ ,~ , <br />Asa cc`1~tlmg to C.R.S. 34-32-] 16(3), and C.R.S. 34-32.5-116(3){a), on the anniversary date of the permit each yeaz, <br />+ operator shall submit a report and a map showing the extent of current disturbances to affected land, <br />' , yreclamation accomplished to date: and during the preceding year, new dismrbances that aze anticipated to occur <br />during the upcoming year, and tt+clamation that will be performed during the upcoming year. Please attach such <br />a repot and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.} <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rule;; <br />(I) the condition of tht: operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application; tmd <br />(iii) plans for resumption of mining operntions. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regazding the sufficiency of the value of the Financial Warranty, specifically: <br />{i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.(5(1)(a), provide an updated <br />statement regazding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, s:rivage <br />credit, and firs[ priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407.4, and Rules 1.15(1)(b), pemtirs secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in propery value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />The repott shall also provide proof that there aze no past-due propetty taxes. <br />(iii) Per the requirements of 2 CCR 407-], 407-4. and Rules 4.7(3), permits secured:.vith. am <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating tha[ the <br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b} Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. <br />(Please note that if you are not a Designated Mining Operation, you will not have an Envirenmental <br />Protection Plan as part of your approved permit.) <br />