Laserfiche WebLink
fi <br />February 2, 1989 <br /> <br />Mined Land Reclamation Division <br />State of Colorado <br />423 Centennial Building <br />1313 Sherman St. <br />Denver, CO 80203-2273 <br />VALCO, INC. <br />LAMAR CONCRETE DIVISION <br />P. O. BOX 591 <br />LAMAR, COLORADO 81052 <br />(719336-2223 <br />I'~ i <br />J •1 E <br />rEa 31989 <br />- ~ .) <br />RE: Annual Report for Permit #77-223, ^iley Pit, Valco, Inc., Prowers County <br />This is the Annual Report for 1988 for the above named pit. <br />1. Mining during 1988 was removing material in the same area that was mined <br />by lowering elevation two (2) feet in the bottom in some areas. This <br />cleaned up the area and did not effect any acres mined during 1988. <br />2. No acres were reclaimed for the year. <br />3. 0 <br />4. None <br />5. None <br />6. Those acres back sloped in previous years have a good stand of natural <br />vegetation. Additional attention will be given to those areas during <br />1989. <br />7. Anticipated mining in 1989-90 would occur in the same Stage I. Affected <br />acres would be approximately 1 to 3 acres. <br />8. The effective date of this information is February 2, 1989. <br />Also, please accept this letter as our statement that because the affected <br />land was used for less than 180 days last year this does not constitute any <br />temporary cessation of mining, and should circumstances occur in 1989-90. <br />similar to the afore mention this also would not constitute any temporary <br />cessation of mining. <br />Please find a check enclosed in the amount of $350.00 for the annual fee. <br />Byron E. Grimes <br />General Manager <br />BG/sw <br />Enclosures <br />ROCKY FORD PUEBLO <br />~/ <br />~~ <br />CANON CITY GUNNISON <br />CRESTED BUTTE <br />