My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP31762
DRMS
>
Back File Migration
>
Report
>
REP31762
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:07:59 AM
Creation date
11/27/2007 6:00:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Report
Doc Date
9/8/2003
Doc Name
1st Quarter 2003 Refuse Pile Inspection Reports
From
Energy Fuels Mining Company
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_~.,1 <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: Raton I <br />Waste Bank MSH, <br />Inspection Period: <br />Inspection Date: <br />(~ ~f <br />ID. No.: Primary Refuse Disposal Area <br />First Quarter 2003 <br />03/06/03 <br />General Description or Reference to Site Plan: <br />Raton Creek Mine is in final reclamation. All required structures have been removed, <br />the area brought to final grade, mulched and seeded. Areas of lesser vegetation <br />density were inter-seeded in 2000. <br />Activity During Inspection (Including General Observations): - <br />Area was inactive thoughout the quarter. The silt accumulation has been partially removed from <br />the adjacent sediment pond. Vegetation was sparse due to draught conditions in 2002 <br />and unrestricted grazing by the surface owner's cattle. Minor erosion on the south and west `=;~'='"'°"'"q"° <br />facing slopes continues with some of the contour ditches blocked or breached by sediment r,~ "` _ <br />accumulation. ~~ _•~ <br />--~- -_ ~^ <br />Drainage: (Discussion of springs. seeps, overtand and channel flow, underdrain construction - ° ---- - -- _ <br />andloc discharge, integrity of 100-yr 24hr d~ainage'strudures .'ahd:evidence of po§itive draihage) _;_ _ <br />- - - - - - <br />._... ~- <br />_ _ - .. , ..,.. ....,y.. ~ ,,..., ..., <br />"_ sparsely vegetated areas. Drair <br />1~ accumulation noted'on the west <br />Underdrain construction has been completed. <br />ui~oura~cas~wiy~ auuio ~numy-yn-+nuaa -- _- _ _- _ _ , <br />du?es were intact with :some: sed~inent - x <br />~bovejandeto fhesouth of the wafe~.tank . = ~ ~ `Y _ <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, <br />slopes, and construction methods). <br />Structure has been completed to final grade. No additional material placement is anticipated. <br />Page 1 of 2 <br />~~`_~.._._ `-``": _- "-~.._ _ ~,~~~~,. ___ _. ._:.__.. _ __.. .~_.v =Fare-,~-w~~,~„w+r-.___..._, _ 4 -" <br />
The URL can be used to link to this page
Your browser does not support the video tag.