1
<br />• •
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />According to C.R.S. 34-32-116(3), and C.R.S. 34-32.x-116(3)(a), on the anniversary date of thc° permit each year,
<br />the operator sh:dl submit a report and a map showing the extent of current disturbances [o af;ected land,
<br />reclamation accomplished to date and during the preceding year, new dis[urbances that are anric:ipated to occur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and map [o enclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written repot[.)
<br />If your operation is subject to the provisions of Temporary Cessation az defined in the Act and Rules, you must
<br />provide with the Annual Repot[ the following information az required by 2 CCR 407-1, 407-4, and Rules
<br />1.13.7(I)(a):
<br />(I) [he condition of the operation at the time of cessation;' -
<br />(ii) what specific measures have been and will be implemented to comply with reclamation,
<br />performance standards and Environmental Protection Plan requirements, if they are patt of your
<br />approw:d application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide she additibnal following information with your Annual Report, as applicable: ~ ,~
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement
<br />regazding the sufficiency of the value of the Financial Warranty, specifically:
<br />(n er the requirements of 2 CCR 407-1, 407-4, and Rules I~~1 1)(a), providacan updated
<br />~Q ~j ~ the sufficiency of the valu w tfically,
<br />•~hi ~w~~~~[Ceof credit, Deeds of Trust, ap~' me~e -Snsur'an e, alvage
<br />' ~v ~ oc~, d fits[ ~ty liens on project rela~~~t ~r, Q~
<br />~~ ~ C ~ r~ requ~ts of 2 CCR 407-1, 40711, and Rules 1.1R7~ p ecitl~~
<br />ee o rust o a unity Agreeme h era~~QQjj h rrtrt date, ~~11u feed
<br />independent appraiser, indicating anylc ilpp(a~ue,.~d~st~ t~tt+~ur~t
<br />any circumstances which may affect the adequacy of the Deed of Trust, or~curity Agreement,
<br />and the value of the property subject to either of these instruments.
<br />The report shall also provide proof that there are no past-due property taxes.
<br />y~ (iii) Per the requirements of 2 CCR 407-1, 4071>•, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the
<br />Letter of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(vi) Per the requirements of 2 CCR 407-1, 4071}, and Rules 4.9.3(c), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />detail to fully describe the condition, value, and location of all pledged fixtures
<br />and equipment. ~.~
<br />ate"y
<br />(b) Peealt ttCmen~~f 2qC 07-1, 407-4, and Rules 1.15(1)(c), all moni[or}fig info a~ipn~
<br />re uireb~a ~of the fo t a ![cation, to include t r
<br />(Pleasekertotliatif }bu~ar~ t}~gnaPed alining Ope[aaon, yo wtl no have an Envi nmental
<br />Protection Plan as part of your approved permit.) F
<br />
|