Laserfiche WebLink
<br />I111'ltitlfdl fJr Ql NA 14N/11 HI SnUB(:FS <br />Il,unti U tih~., u..u.. Erc, ~~t~ac Uuocan <br />?21 <br />jrR3,'Cen lcnnial [luildini.l, 1313 Sh rrman Sir rcl <br />Drnver, Coluraclu 80203 Tcl. (303) 8393567 <br />Hamlet J. Barry, III, <br />Director <br />13 June 1980 <br />TO: Roger Funston <br />FROM: Jim Pendleton '/ <br />RE: Telephone conversation with Steve Self, Empire Energy, regarding <br />stipulated submission of shear strength data on Refuse File <br /> <br />I returned Steve Self's phone call several times, per your request, finally <br />making contact at approximately J:20 pm this afternoon. Steve inquired <br />about the timing for the requirerl submission of a "stability analysis". <br />At that point I realized that there was apparently some confusion regarding <br />the actual requirement of the stipulation. <br />In order to clarify the st.rpulat)nn I cxl~.lai.ncd to Steve my understanding of the <br />situation regarding the approval of the new refuse disposal area. C.T.L. <br />Thompson prepared a sta;>iliCy analysis for the suhj~ct refuse pilclwhich was <br />a component of the permit .ihplicatiwr. The analysis assumed a shear strength <br />for the refuse heca use a s: unl~le 1.•as not avoi.Jalil e. The stipulation rrr/wired <br />that trst_iny data t:o suhstonf into fhc shear strength which C.T.L. 'I'humpson <br />a rsumed bn suhmitl. cd within :ix m~mf:hs frrJ lowi ml Chc cormmrncmcnt. ref disposal <br />within the nn_w refuse rlislm:,.rf nro.~. 5'tovc indicatr:d that di:;l~nra1 ~ctual(y <br />commenced ]ast 1.•eek. .7 .i.ndicnted that the supportive testing data would be <br />due prior to "the r_nrl of 1980". <br />