Laserfiche WebLink
QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: <br />Waste Bank MSHA ID. No.: <br />REC~~v~® <br />NOV 3 p ~~~~ <br />0\u\gos d M\e,,at ais sad ~ao1o9~ <br />Inspection Period: Third Quarter 2005 <br />Inspection Date: 09/22/05 <br />General Description or Reference to Site Plan: <br />Raton Creek Mine is in final reGamation. All required structures have been removed, <br />the area brought to final grade, mulched and seeded. <br />Activity During Inspection (Including General Observations): <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100.yr 24hr drainage sWctures, and evidence of positive drainage). <br />All required underdrain construction has been <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, <br />slopes, and construction methods). <br />Structure has been completed to final grade. No additional material placement has occurred <br />this quarter nor is anticipated. <br />Page 1 of 2 <br />