Laserfiche WebLink
1 <br />1 <br /> Mine discharge was determined from the hours of pump <br />' operation at the pump capacity of 50 gpm with no <br /> head. Initial pumping started on June 18, 1983. <br />' <br /> Cumulative inflows for the third and fourth quarters <br />' w <br />r <br />det <br />rmined b <br />int <br />tin <br />er tim <br />th <br />tim <br />d <br />t <br /> g ov <br />e <br />e <br />e <br />y <br />egra <br />e <br />e es <br />a <br />e <br />' inflow hydrograph in Figure I.4-1. The hydrograph was <br /> obtained by fitting a smooth curve to the measured <br />' flows reported in Table I.4-2. No inflows were ob- <br /> served during the first quarter. The inflows during <br />' th <br />d <br />r <br />well bel <br />w thr <br />e <br />ll <br />ns <br />r <br />t <br /> quar <br />ga <br />pe <br />e secon <br />e <br />were <br />o <br />e <br />o <br />' minute and were estimated as less than 2000 gpd. <br /> <br /> <br /> <br />1 <br />1 <br />1 <br /> <br />1 <br /> <br />' -15- <br />